Quality · Section QC-01
A written QC plan before production, evidence at six checkpoints during it, and third-party inspection before anything ships. This page is the system, in full.
The system
Most supplier disputes are really specification disputes. We remove them by writing the QC plan first — then production simply has to match it.
Height, diameter, brimful capacity and weight sampled per lot against agreed tolerance bands.
Critical / major / minor defect classes (cords, stones, blisters, chips, finish faults) with AQL limits per class.

Polariscope checks post-lehr and thermal-shock sampling for service durability in commercial use.
Tape and wash testing for prints and decals; heavy-metal-controlled inks for regulated markets.
Photo/video QC report with every lot; third-party inspection slots scheduled on request.

Certifications & compliance
Quality FAQ
Every export lot is produced against a written QC plan agreed before production — tolerance bands for height, diameter, capacity and weight, an AQL sampling plan for defects, and decoration adhesion criteria. The plan is signed before the furnace runs.
Yes. We schedule SGS, Bureau Veritas, TÜV or your own QC team for during-production or pre-shipment inspection on request, and we hold dispatch until the report clears.
Yes — soda-lime glass is inert and food-contact safe. For decorated articles we control heavy-metal limits in inks and can supply migration test reports from accredited labs for regulated markets.
It doesn't ship. Failed lots are 100% re-sorted or remade at our cost — the QC plan defines acceptance before production precisely so there is no negotiation afterwards.
RESPONSE WITHIN 1 BUSINESS DAY · FOB / CIF QUOTES · CONTAINER LOADING INCLUDED